Etusivu | Ota yhteyttä Worldwide | Local Sites 
09.07.2008

  Ratkaisut | Tuotteet | Palvelut | Yritys | Tapahtumat ja julkaisut |  Asiakastuki | Kumppanit | Toimistot  


Tapahtumat ja julkaisut


Tulevia tapahtumia


Ajankohtaista


News in English

News in English


CMPro5 for NCC International (30.5.2008)
Construction and property development company NCC International Oy has purchased CMPro5 –project cost management system for managing costs of their projects in Russia. Subsidiary of NCC in Russia is NCC Real Estate LLC in St Petersburg.

New version of CMPro5- application is published (27.5.2008)
Artemis Finland has published new version of the CMPro5 cost management application in March 2008.

New version 2.7 includes numerous new features and improvements that are mainly based on customer requests. Changes are related to all modules in CMPro5 application. Performance improvements are implemented e.g. main cost control windows are working faster. Windows Vista is now supported. The most significant new feature is “Additional and change work management” functionality in Cost Control module.

CMPro 5 is a project cost management software designed to productional investments of industry and construction projects to meet their financial objectives. CMPro 5 modules can be used for cost estimating, tendering, cost control, income control and unit price contract management.

CMPro5 for Mondi Packaging Paper (4.1.2008)
Mondi Packaging Paper has purchased CMPro5 –project cost management system.
The delivered CMPro5 system is designed to manage all stages of the project cost management, including setting of objectives and steering the project to meet the objectives.

CMPro5 for Ruukki Group (4.1.2008)
Ruukki Group has purchased CMPro5 –project cost management system for sawmill and chemical pulp mill investment projects in Russia.

CMPro5 for Talvivaara Project Ltd (16.8.2007)
Talvivaara project ltd has purchased CMPro5 –project cost management system. Talvivaara Mining Company is founded in 2003. Talvivaara’s main activity is the development and exploitation of the deposits in Sotkamo, Finland. The Talvivaara deposits comprise one of the largest sulphide nickel resources in Europe with 336 million tonnes. The mine is also expected to produce copper, zinc and cobalt as by-products of the process.
Mining is expected to start in late 2008, with an expected annual nickel output of approximately 33,000 tonnes; the Company has the potential to provide approximately 2.3% of the world’s current annual production of nickel by 2010. Resources are sufficient to support anticipated production for a minimum of 24 years.

CMPro5 for Gustav Paulig (23.02.2007)
Gustav Paulig Ltd has purchased CMPro5 –project cost management system for the “Paahtimo R 2010” investment project.

CMPro5 for Stockmann Group (21.02.2007)
Stockmann Group, a Finnish listed company engaged in the retail trade, has purchased CMPro5 -project cost management system. The delivered CMPro5 system is designed to manage all stages of the project cost management, including setting of objectives and steering the project to meet the objectives.


Sivustorakenne | Tietosuoja
 
© 2001-2008 Artemis International Solutions Corporation. Kaikki oikeudet pidätetään.
Sivuston käyttöä voidaan pitää käyttöehtojen hyväksymisenä
Käyttöehdot.